Santa Rosa Junior College Elliott Avenue Buildings

This design-build project is being developed with a team that includes TLCD Architecture and Meehleis Modular Buildings. The project involves constructing buildings totaling 25,000 square feet, which will serve as swing space while the junior college’s new STEM building is constructed and will later become permanent instructional space, administration offices, and faculty offices. There is a tight time table for the project as the college needs the space for the summer of 2019. This constraint is one of the reasons that the SRJC decided to go with modular building construction. Meehleis Modular buildings is pre-fabricating the building modules at their plant in Lodi. One interesting aspect of the design is the requirement to meet the College‚Äôs Zero Net Energy standards. Construction is expected to begin in mid-2018.