You are here: Projects/Current Projects / Wheeler Farms Winery

Wheeler Farms Winery

Project Team: Taylor Lombardo Architects

SQ footage: 33,540

Project Manager: Mark Davis
Estimator: Rick Grossmann
Superintendent: Tom Kane & Tom Monroe

New Winery Production Facility with Production Support Offices and New Hospitality Center. Production Facility consists of 14,140 SF below grade cast-in-place concrete barrel cellar and 9,600 SF Pre-engineered Metal Building structure with board and batten siding for 60 fermentation tanks. Production accessibility from main level to cellar accomplished with industrial grade 20,000 lb freight elevator. Separate Production offices and Hospitality facility buildings are constructed of wood framing. Sitework includes pervious paving, new complete waste processing facility and all new site utility infrastructure.

Green Components: Cloacina process wastewater treatment system creating recycling for irrigation water to be stored in new site built bolted steel storage tanks. Propane gas back-up generator and pervious paving system to create water retention and storage.

 

Get Directions:

    • Wheeler Farms Winery
    • Wheeler Farms Winery